From outdated layouts to homes built from the ground up
Total renovation
Modernize the whole house
We update outdated layouts, plumbing, and structural masonry while keeping the building stable throughout the work. Phases are sequenced so occupied areas stay usable where possible.
New build
Building from the ground up
New homes proceed from foundation excavation and reinforced framing through masonry and roofing to a turnkey finish. Each stage is inspected before the next begins.
Finishing work
Ceilings, steel framing, and protective paint
Specialized installation and finishing work that completes the structure and keeps it protected.
PVC ceiling installation
Durable PVC ceilings installed on light steel or timber framing, with clean edges and moisture-resistant panels suited to the Malang climate.
Light steel work
Moisture-resistant light steel trusses and framing for roofs, ceilings, and partitions, fitted and fixed to structural tolerances.
Painting
Protective masonry and interior painting prepared with proper surface treatment, so finishes last and resist moisture.